Nepal asks China to help reopen flood-damaged Rasuwa border crossing

Nepal has asked China to support the reconstruction of flood-damaged infrastructure in Rasuwa and help reopen the Rasuwagadhi–Kerung border crossing, one of the country’s key trade routes with China. Infrastructure Development Minister Sunil Lamsal made the request during a meeting with Chinese Ambassador Zhang Maoming in Kathmandu on September 25.

The Rasuwagadhi border point was severely damaged by the devastating Bhote Koshi River flood on August 26. The disaster destroyed roads and other infrastructure around the border area, leaving the crossing inaccessible from the Nepali side and disrupting an important channel for Nepal-China trade.

Minister Lamsal said Nepal needs Chinese support to restore the road connecting Syaphrubesi with Rasuwagadhi and make the route operational again. The government is currently working on temporary road and transport arrangements while also preparing longer-term plans to rebuild the damaged corridor with stronger and more resilient infrastructure.

The disruption has created additional pressure on Nepal’s northern trade routes. With Rasuwagadhi closed and Tatopani also facing disruptions, more cargo has been diverted toward the Korala border point in Mustang, which has seen a sharp increase in customs activity.

Rasuwagadhi is an important gateway for goods entering Nepal from China, including electric vehicles, machinery, electrical equipment, clothing and other commercial products. The crossing had resumed operations earlier this year after previous disruptions, making the latest flood damage another major setback for traders and transport operators.

During the meeting, Ambassador Zhang said China was ready to provide possible support. He also indicated that a detailed study should be carried out before rebuilding Rasuwagadhi so that the new infrastructure can be more resilient and effective. China has also expressed support for the effective operation of the Korala and Tatopani transit points.

Nepal is also preparing a new detailed project report for the long-term development of the road network linking Kathmandu with Rasuwagadhi and Kerung. The government says it is working to open necessary tracks and improve connectivity while immediate efforts focus on restoring access to the damaged border area.

The reopening of Rasuwagadhi is important not only for cross-border trade but also for communities in northern Rasuwa that depend on the route for transportation and access. Restoring the corridor could help ease pressure on alternative border routes and support the recovery of businesses affected by the flood.